Mediterranean Kitchen at Kensington Church Street
This restaurant was refurbished during a 4 week period
All the existing fixtures and fittings were removed, a completely new hardwood floor laid throughout, and new fixed banquet seating manufactured and installed
A new bar was built, new waiter stations with modern data networks installed, and a new feature fireplace fitted
The lighting inside and out was upgraded and the mechanical and electrical installations to the kitchens altered to suit the new kitchen equipment
The restaurant was decorated in new livery inside and out



